Online, double conversion
Transfer
0 ms
Input
110–300 V (1Ph)
ECO mode
≥98.5%

Industrial Online UPS, 1–800 kVA

Built for unstable grids. Double-conversion uninterruptible power supply systems from our factory in Nantong, for plants, data rooms and projects.

Single-phase online UPS tower
Single-phase1–10 kVA
Three-phase online UPS tower on castors
Three-phase10–600 kVA
Modular online UPS cabinet with touch screen
Modular20–600 kVA
1–800kVAOnline double conversion
0msMains-to-battery transfer
110–300VSingle-phase input window
CEEN IEC 62040-1 and 62040-2
NantongOwn factory, Jiangsu, China

Online first, built for projects

1 kVA in a control cabinet to 800 kVA for a whole plant. All double conversion, all available under your brand.

All products, energy storage and accessories →

Certified and already shipped

Ready for a consultant or a tender file.

Safety and EMC

CE · EN IEC 62040-1

  • High-frequency online, 1–600 kVA
  • LVD + EMC
Exported to

Indonesia · Philippines · Singapore

  • 220–240 V
  • 380–415 V
  • 50 / 60 Hz
Monitoring

SNMP · Modbus · dry contact

  • CE LVD certificate, Three-phase online, to 600 kVALVD · Three-phase online, to 600 kVA
  • CE EMC certificate, Three-phase online, to 600 kVAEMC · Three-phase online, to 600 kVA
  • CE LVD certificate, Three-in, single-out online, 10–30 kVALVD · Three-in, single-out online, 10–30 kVA
  • CE EMC certificate, Three-in, single-out online, 10–30 kVAEMC · Three-in, single-out online, 10–30 kVA

What happens when the mains fails

The battery is already on the DC bus. Nothing switches, so the load sees no break.

On mains
Input
Present
Battery
Float charge
Output
On inverter

Transformer-based or high-frequency?

Same double conversion. One transformer makes the difference. Full comparison

Transformer-based

Industrial UPS, 1–800 kVA, built to project spec

Grid
Weak, unstable or noisy supply
Load
Motors, drives, inductive loads with high inrush
Isolation
Galvanic isolation between inverter and load
Output PF
0.8 (three-phase)

High-frequency

Online UPS, 1–600 kVA, CE tested

Grid
Stable to moderate supply
Load
Server rooms, IT, telecom, medical equipment
Efficiency
Up to 95.5%, ECO mode ≥98.5% (three-phase)
Input PF
≥0.99

Where our systems run

Where a dropped cycle means scrap, a trip or lost data.

All applications →

Built in Nantong, designed in Nanjing

Own production base and R&D center, Jiangsu, China.

UPS production line, Nantong factory
UPS production line, Nantong factory
UPS production line, Nantong factory
UPS production line, Nantong factory
UPS production line, Nantong factory
UPS production line, Nantong factory

Nantong production and test · Nanjing R&D center

OEM / ODM under your brand

Your logo on a proven platform.

  1. Inquiry

    Series, power, quantity.

  2. Sample

    Test on your own loads.

  3. Customization

    Logo, panel, packaging, manual.

  4. Production

    Built to the approved sample.

Voltage, frequency, protocols, battery autonomy and enclosure built to your specification.

OEM / ODM details

Five numbers get you a quote

Send what you know. We reply within one working day.

  1. LoadkVA or kW, and what it is
  2. Input voltage and phasese.g. 400 V three-phase, 50 Hz
  3. Output phasesSingle- or three-phase
  4. Backup timeMinutes at full or typical load
  5. SiteIndoor, temperature, altitude, generator

Buying guides